| Notification [x] |
Sapele Power Station
4 x 125MW
The NIPP was planned as a ‘Fast Track’ Project with 7 Power Stations conceived by the immediate past President Olusegun Obasanjo's Administration of the Federal Government of Nigeria to address the twin issues of low power generation and gas flaring from oil exploration in the Niger Delta region.
Employer: Ministry of Energy (Power) Niger Delta Power Holding Company
Design Consultant: Lahmeyer/Otis Engineering (International/Local)
Project Consultancy: SeWa/AETS (APTEC Engineers Technical Services)- International/Local
EPC Contractor (BOP): Consortium of Marubeni Corporation of Japan and Marubeni (West Africa) Limited
OEM Contractor: General Electric Corporation of U.S.A